Forum’s PLRs are equipped with remotely operated vehicle (ROV) readable subsea flow meters and ROV operable choke valves for discharge throttling to control the pigging velocity. Forum also developed and manufactured a landing interface from the PLRs to the pipeline end terminator with a horizontal driverless connection system.