The system was installed on 12 December 2015 at a depth of 5200 feet in the Mississippi Lime play in Woods County, Oklahoma, for SandRidge Energy and has been in continuous operation since.
The system was seamlessly deployed through the deviated section of the wellbore and started on its first attempt with no issues.
In what Baker Hughes calls “an entirely new approach to artificial lift”, the LEAP system is designed to adapt to the dynamic production profiles typical in most unconventional oil wells.
“Until