The Ingleside Energy Center terminal, to be located near Corpus Christi, will have the capacity to unload up to 140 LNG tankers a year and deliver about 1 billion cubic feet of natural gas a day.
The project includes a 42 km pipeline to connect the terminal to a major pipeline system.