Aker Kvaerner said it will deliver about 70 kilometres of high voltage power cables, as well as static and dynamic steel tube umbilicals.
Both the cables and umbilicals will be installed at water depths up to 2700 metres.
The umbilicals will be made using Aker Kvaerner's patented carbon fibre rod technology.
The project management, engineering, and manufacturing will be performed at Aker Kvaerner Subsea's umbilical facility in Mobile, Alabama.
The