The production wells will be supported by water injection wells currently being drilled using the Transocean John Shaw semi-submersible drilling unit and which are due to be on-stream in October, said co-venturer Valiant Petroleum.
During drilling of the southern water injection well on Don Southwest, an opportunity was taken to drill a low incremental cost side-track into a previously undrilled compartment to the south of the field.
Although