Production started on the field on Monday following a planned shutdown for refurbishment of floating production storage and offloading vessel Rubicon Intrepid – which saw the vessel undergo re-certification, maintenance, inspection and turret installation work.
In a GPC announcement, the company said the most significant work done was the installation of a bow mounted, non-disconnectable turret mooring system to replace the previous disconnectable system.
The