The P-63 vessel, which was converted into an FPSO from the tanker BW Nisa at the Cosco Shipyard in China, will now head to the Campos pre-salt basin where it will be installed "after being finished, strictly within the set period", Petrobras said in a statement late on Friday.
The facility has a production capacity of 140,000 barrels of oil per day and can compress 1 million cubic metres of gas per day.
It