Greece’s J&P Avax has landed a contract for construction of the Greece-Bulgaria interconnector line that will deliver gas from the Shah Deniz 2 development in Azerbaijan's Caspian Sea to Bulgaria.

J&P Avax will build the 183-kilometre Bulgarian section of the pipeline that will be connected in Greece with the Trans Adriatic pipeline (TAP), which is expected to launch in 2020.