According to sources, the base-case development concept for the Julimar gas project comprises two bridge-linked, fixed platforms in a water depth of about 100 metres, which will be connected to subsea production manifolds in more than 200 metres of water.

Subsea flowlines will link the manifolds to the platforms, and a new subsea export pipeline will carry Julimar gas to Apache's Varanus Island gas processing facility.

Apache