This is the second contract that Dragados has won to build a compression platform for Pemex’s new Litoral processing centre.
Weighing in at about 13,000 tonnes, the CB Litoral A compression platform is smaller than the 15,000-tonnes CA Litoral A platform Dragados will build.
The larger compression unit is being built “with flexibility” to comply with new operating conditions in the yet-to-be-installed Litoral processing centre.
The