EMP holds 50% of the Kangean Energy Indonesia (KEI) consortium, which operates the block off East Java.

There is already production from the mature Kangean block that EMP bought several years ago from BP after the former operator was unable to agree an extension with the Indonesian authorities.

However, EMP has struggled since to arrange financing to develop the Terang-Sirasun-Batur fields and the situation has now been exacerbated by the global credit crunch and oil prices falling to a four-year low.

Six