The well was drilled through a 1300-foot thick salt tablet encountered at 9270 feet to a depth of 13,287 feet. Production from the well is being processed at the Enchilada A platform, as will future production from wells planned from the recently installed Salsa B platform in Garden Banks block 172. Additional wells are planned to develop reserves at Enchilada, about half of which will be subsalt.