Jau lies in the deep-water Krueng Marine production sharing contract about 100 kilometres off Nanggroe Aceh Darussalam.
Eni has outlined a preliminary plan to develop the deep-water field by tying in two subsea wells in 600 metres of water to a medium-sized platform.
The processing platform boasting, between 5000 tonnes to 6000 tonnes of topsides, will be installed in about 100 metres of water, according to sources.
While