The first covers the supply and building of five topsides weighing more than 2870 tonnes as well as an interconnecting bridge, two wellhead jackets and a tie-in jacket weighing more than 4300 tonnes.

The job also involves a subsea template to support pipeline installation in the Safaniya and Zuluf fields. In addition, the US company will install three 16-inch pipelines totalling more than 17 kilometres in the Zuluf and Safaniya fields as well a 20-inch pipeline in the Safaniya field.