The field operator floated a tender earlier this year for FEED studies on the second development phase, that will bring the Sirasun and Batur fields into production through a subsea development tied back to the leased BW Joko Tole floating production, storage and offloading vessel.

Indonesia’s home-grown engineering outfit Singgar Mulia is understood to be well-placed to clinch the FEED contract following several re-submissions of the commercial bids.

Upstream