The company has earmarked about $100 million this year for work on production facilities at the field at Block 16-05, which lies in 107 metres of water in the Pearl River Mouth basin.
The scheme calls for installing a central processing platform with a subsea production system tied back to existing production facilities at the nearby Lufeng 13-1 field, operated by China National Offshore Oil Corporation (CNOOC).
The