US INDEPENDENT Noble Energy is considering the possibility of developing the first phase of its 22 trillion cubic feet Leviathan gas discovery off Israel via a fixed platform.

Gary Willingham, the US player’s head of operations, told analysts this week that a fixed platform offers a faster schedule to first gas and more flexibility than its original pre-oil price collapse concept based on a floating production, storage and offloading vessel.

“Along