The FPSO is on its way to Lyngdal port, in Norway.

OSX-1 has capacity to produce 60,000 barrels per day of oil, but pumped minimal flows from Tubarao Azul, after OGPar admitted the shallow-water development was not big enough for the size of the FPSO.