Situbondo in East Java is the preferred location for PGN's planned receiving and regasification facility, and a floating gravity-base facility could be on the cards, according to ex-president director Washington Simandjuntak.
A strategic partner will be sought to help PGN implement the project that will be able to handle between 1.5 million and 3 million tonnes per annum of LNG, Bisnis Indonesia quoted incumbent boss Sutikno as saying.