An oil slick 15 kilometres long and 30 metres wide resulted from a 21 August blowout from a well on the Montara wellhead platform.

Another jack-up owned by Seadrill, the West Atlas, was working at Montara at the time of the incident. It was drilling through the platform on an adjacent well, and all ?69 personnel on board had to abandon the unit.