The winter weather forces a close-down at the end of September, leaving a window of just 75 days for work to be done.

During this season, Eurospiraal would tow the ready-made spiral of pipe to a point on the route as far inshore as the 1.5-metre water depth mark. In the region's very shallow waters this point is about 30 kilometres from land.

Meanwhile,