CGG has been enlisted by Equinor to process 4D seismic data acquired from a permanent reservoir monitoring (PRM) system installed at the under-development Johan Sverdrup field off Norway.
The French seismic contractor will provide high-quality images for analysis by Equinor’s geoscientists to optimise production management and hydrocarbon recovery at the North Sea field.
Its contract with the state-controlled operator will run from the second quarter of this year with a firm duration of 31 months and two optional extensions of three years.