The maiden cargo, which is being transported by the LNG carrier Tangguh Foja, is en route to Posco's receiving terminal at Gwangyang in South Korea.
Tangguh, Indonesia's third liquefaction project after Bontang in East Kalimantan and Arun in Nanggroe Aceh Darussalam, will receive its feedstock gas from six fields in the Wiriagar, Berau and Muturi production sharing contracts.
The gas flows via two not normally manned platforms through a 22-kilometre pipeline to the two-train Tangguh project, which will have production capacity of 7.8