The company said that gas flow rates from each of the Mnazi Bay wells, MB-2 and MB-3, exceeded expectations.
MB-2 flowed 10.7 million cubic feet per day of gas from a 19.5-foot reservoir one of four zones hit with 15 barrels of oil recovered.
MB-3 flowed 10.9 MMcfd from one of four reservoirs with 14 barrels of oil recovered.
The exploration well, Msimbati-1X, was tested at 9.3