Sources said Vestigo has found that field production has exceeded expectations, and that measures are being drawn up to boost production and prolong the field’s economic life via infill drilling.There is also a suggestion that a larger floating storage and offloading vessel could be deployed at Anjung Kecil to replace the existing Nautica Muar FSO.

The Nautica Muar is owned by local contractor EA Technique, and sources said Vestigo and EA are in discussions about redeploying it to another Vestigo-operated field.

Vestigo