Shell has filed a plan to return to operations at the site of its Power Nap discovery, a 2015 find that is located close to the Vito field that it is currently developing.
The Anglo-Dutch supermajor has filed a new plan for Mississippi Canyon 943 that involves the drilling and completion of up to six wells on the block.
The first spud is planned for 14 September of this year, continuing thereafter with a schedule ranging through 2021.