Gas production from the two fields will be transported via the Seahawk gathering system, which will consist of 245 kilometres of 18-inch diameter pipe to a new shallow-water facility in Galveston block A-244 and an 88-kilometre, 24-inch diameter pipeline for exporting gas from the shallow-water facility to an interconnector on Williams' Central Texas gathering system in Brazos block 538. Oil production from the field duo will flow via a new 16-inch diameter pipeline dubbed the Banjo (or Boomvang And Nansen Joint Oil) system.